[ T1 ] Free tool
Patrol plangenerator.
Describe the site and your team. You get a checkpoint list, a round schedule with varied start times, and an honest check on whether one shift can walk it.

Free tool
Plan the route before the first shift, not after the first complaint.
Property type
Site areaapprox.
Buildings
Floors (tallest)
Critical points to add
Guards on patrol
Rounds per shift
Shift length
Shift starts
Your plan
10checkpoints
~17 min
per round
Workload: Comfortable
15%
There's room for incidents, breaks and the odd extra check.
Checkpoints
- 1Main gate
- 2Loading docks
- 3Warehouse interior
- 4Trailer yard
- 5Perimeter 1
- 6Perimeter 2
- 7Perimeter 3
- 8Building 2 entrance
- 9Generator / fuel
- 10Roof access
Round schedule
- R120:11 – 20:28±10m
- R222:19 – 22:36±10m
- R300:09 – 00:26±10m
- R402:03 – 02:20±10m
- R503:52 – 04:09±10m
- R605:50 – 06:07±10m
Start times are deliberately varied so the route can't be predicted from outside the fence.
[ T1.1 ] Questions